Installation InstructionsFor Monsoon ExtraUniversal Single Duty PumpMedium Pressure U1.4 bar High Pressure U3.0 barHigh Pressure U3.5 bar High
- 10 -Cont ...4. Push pipe firmly into fitting, until pencil mark is level with the top of the collet and the pipe stop resistance is felt. Pul
- 11 -Cont ...The pump should not be screwed down, ensure anti-vibration feet and flexible hoses are used.Pump Connections (General)Fig. 1622 mm coppe
- 12 -Cont ...STEP 5 ELECTRICAL INSTALLATIONWARNINGS: The electrical installation must be carried out in accordance with the current national e
- 13 -Cont ...Wiring of connection unitWARNING: This appliance must be earthed.The wires in the mains lead are coloured in accordance with the followi
- 14 -To enable correct assembly of the cable gland, the ‘O’-ring (Fig. 20, item 1) must be placed over the cable before the clamping insert (Fig. 20,
- 15 -Cont ...1. System Flushing This pump incorporates push-in connectors and plastic components that must not come into contact with solder fl
- 16 -4. Starting The Pump a) Ensure all outlets are closed, turn power supply ‘on’ - pump will start, pressurise the system then stop. b)
- 17 -Cont ... c) Release system water pressure by opening a system outlet (tap). d) Isolate both the hot and cold outlet water supplies by closin
- 18 -Cont ...Stuart Turner reserve the right to amend the specification in line with its policy of continuous development of its products.Note: For
- 19 -Cont ...NOISEThe equivalent continuous A-weighted sound pressure level at a distance of 1 metre from the pump does not exceed 70 dB(A).TROUBLE S
- 2 -TYPICAL INSTALLATION (Cold Water, Universal Duty, Single Pump System)The plumbing installation must comply with the following:The Water Supply (W
- 20 -Cont ...Dry Run ProtectionThis pump is fitted with a safety control circuit, which will detect the following fault condition: Dry running caus
- 21 -Cont ...Flow Switch Circuit Test1. First confirm visually that the flow switch reed clamp has not been dislodged during handling or instal
- 22 -Cont ...GOOD PRACTICEPlease record here for your records.Always flush system prior to starting a new or serviced pump.Always ensure the pump is
- 23 -YOUR 2 YEAR GUARANTEEStuart Pumps are guaranteed by Stuart Turner Limited to be free from defects in materials or workmanship for the applicabl
Stuart Turner Ltd, Henley-on-Thames, Oxfordshire RG9 2AD ENGLAND Tel: +44 (0) 1491 572655, Fax: +44 (0) 1491 573704email: pumps@stuart-turn
- 3 -Re-positioning of Pressure VesselThe pressure vessel can be rotated to alternative positions (Figs. 4, 5 & 6) in the event of the factory fit
- 4 -Cont ...STEP 2 PUMP LOCATION (General)WARNINGS: Pump Location If possible site the pump in a location where in the unlikely event of a wa
- 5 -Cont ...Cold Water InstallationsBefore deciding where to locate the unit, check to ensure the static inlet head (Fig. 8) meets the minimum requir
- 6 -Cont ...Before deciding where to locate the unit, check to ensure the static inlet head (Fig. 9)meets the minimum requirement of 1 metre and does
- 7 -Cont ... Do not install a non-return valve, or devices which contain non-return valves, in the suction (inlet) pipework to the pump.
- 8 -Cont ...Pipework Connections (Connection between pump and system outlets)This should run as far as possible in 22 mm copper tube. Any bend requi
- 9 -Cont ...Hose to Pipework1. Stuart Turner recommend only the use of their 22 mm flexible hoses. The hoses are fitted with plastic push-in connec
Comentários a estes Manuais